Constraction title:
Cassovar Residence – Cassovar Complex – phase I.
Customer:
Chemkostav, a.s.
Subject of the contract:
Electrical installations heavy current, low current; EFAS; Measurement and regulation; Low voltage wiring system in the grounds; Public lighting; Outdoor lighting of the grounds
Construction time:
25.03.2008 - 30.06.2009